Work Continues on the Klaus Trail

After Saturday’s great work, Sunday the FOSM saw crew led by Sam Beard and including Scott Dietrich, Michael Arndt, Sim Cook, and Cliff Giles continued clearing corridor along a new reroute of a steep section of the old Klaus trail. This week we are continuing with the excavator to level the trail to the south. This reroute section will require a significant amount of leveling, stump pulling and rock work, possibly utilizing some rock cages to create a level base on the lower side of the trail. Likely we will be organizing a Saturday work group for Aug. 6 so stay tuned for that announcement.

Michael Arndt beginning a cut on a cork bark fir with Sam Beard assisting.
Sam, Scott and Michael bucking a felled tree
Scott, Sam and Michael limbing and bucking.
New cleared corridor rerouting a steep section, now ready for leveling.
Scott at the helm.